Page 61 - Demo
P. 61
Mounted on a free-standing frame.CascadesQuinta Ace back-to-back configurationPlease refer to the data sheets available on remeha.co.uk for further details.Back-to-back mounted on a free-standing frame configuration for Quinta Ace 30, 45, 55, 65, 90, 115, 135 and 160kWDimensions in mm with DN65 collector pipes 3-4 boilers 5-6 boilers 7-8 boilersA Total width 1,110 1,640 2,170B Free space required for mounting the blanking flanges (1) 50 50 50C Total height 1,576 1,576 1,576D Free space above the boilers (recommended) 500 500 500E Free space in front of the boilers (recommended) 1,000 1,000 1,000F Total depth 1,095 1,095 1,095G Flow connection DN65 PN6 DN65 PN6 DN65 PN6H Return connection DN65 PN6 DN65 PN6 DN65 PN6I Gas connection DN50 PN16 DN50 PN16 DN50 PN16Dimensions in mm with DN100 collector pipes 3-4 boilers 5-6 boilers 7-8 boilersA Total width 1,310 1,940 2,570B Free space required for mounting the blanking flanges (1) 55 55 55C Total height 2,004 2,004 2,004D Free space above the boilers (recommended) 500 500 500E Free space in front of the boilers (recommended) 1,000 1,000 1,000F Total depth 1,278 1,278 1,278G Flow connection DN100 PN6 DN100 PN6 DN100 PN6H Return connection DN100 PN6 DN100 PN6 DN100 PN6I Gas connection DN65 PN16 DN65 PN16 DN65 PN16(1) When fitting a blanking flange with an expansion vessel connection, make sure there is enough space for fitting the vessel.Gas boilers 61